There are also times when output posting must be reversed.An example of this would be if a data entry error occurred and an incorrect amount of output is posted to a production order.
To reverse an output posting, manually enter the posting date, Prod. Order No.,Item No., and Operation No. fields in the output journal, and enter a negative value in the Run Time field and output quantity field.You must also fill in the Applies-To entry field.This reverses the capacity and the item ledger entries.
Showing posts with label Manufacturing. Show all posts
Showing posts with label Manufacturing. Show all posts
Thursday, January 3, 2008
Friday, December 28, 2007
New Production BOM in NAV 5.0
In NAV 5.0 Production BOM’s are of two Types: Manufacturing and Kitting. If Type is kitting two other option values will be available for the Prod. BOM Lines Type.i.e. Resource, Setup Resource.
Subscribe to:
Posts (Atom)